State study may be useful tool for MCC school district

April 22, 2025

Letters to the editor are opinion editorials submitted by readers. Letters to the editor are a long tradition in American journalism. The views and opinions of the writer do not necessarily reflect those of Mason County Press, its staff or its parent company. For more information, please refer to MCP’s Letter to the Editor Policy.

Dear Editor,

Please share this letter which I have addressed to the families of Mason County Central School District:

Around spring break and in recent weeks, you likely have heard or will hear about the first-of-its-kind Statewide School Facilities Study. I would like to tell you a little about this historic study, and how it may be a useful tool as part of our continued efforts to provide a safe and healthy learning environment for all Spartans.

This state-funded study, approved by the Michigan Legislature in 2022, determined the actual cost for all Michigan traditional K-12 school buildings to meet basic health, safety and wellness standards. In 2023, educators statewide formed the nonprofit School Finance Research Foundation to oversee the study. The foundation study builds on the 2018 School Finance Research Collaborative study, which for the first time determined the true cost to educate a Michigan student.

The Statewide School Facilities Study provides district-level costs for each school evaluated to meet basic facility standards. This study only provides costs for meeting basic standards for things like HVAC, roofing, electrical, and plumbing. The study does not include administrative, athletic, playground or transportation facilities, additions, renovations or remodeling, or replacing things like sidewalks or buses.

This was an extensive, statewide review of 2,534 buildings, including some of ours, over a two-year period. The report is a roadmap that lets us – as one Spartan community –  determine what, if any, investments we need to make to ensure our students continue to have a safe place to learn, grow and thrive. Overall, the goal is for the Statewide School Facilities Study to become an essential part of the ongoing school funding discussion at the state and local levels.

The State of Michigan is currently one of 11 states that does not provide funding specifically for capital improvements. Those are typically funded through voter approved bond projects and/or sinking funds. In 2006 the Mason County Central School Districts voters supported a $16.9 million bond to build the Upper Elementary School, put an addition on and renovate portions of the High School, and renovate the Middle School and Scottville Elementary.

Since 2017 the Mason County Central School District has invested over $6.35 million general fund dollars to maintain and improve our school facilities.

  • In 2017-18 we invested $3.6 Million in improvements to our HVAC systems, campus-wide LED lighting, track resurfacing and asphalt replacement/repair at the Middle School.
  • In 2022-23 we invested $350,000 in doors and windows at the Middle School and EIFS System at Scottville Elementary.

•In2021-23weinvestedjustunder$1Millionin techdevicesandInfrastructureplus a firstofits kind Immersion Room.

  • In 2022-23 we invested $1.2 million in roof replacements at Victory Early Childhood Center, Scottville Elementary, Middle School and High School.
  • In 2024 we invested $200,000 in phase two of our asphalt repair/replacement/seal coating at the High School, Middle School and Scottville Elementary.

As a district, we’ll work with our school board and community to determine how we might utilize this roadmap to help us continue to provide a safe, healthy learning environment that prepares our students for success and careers.

Sincerely,

Jeff Mount, superintendent

Mason County Central Schools

Scottville

________________________

Please Support Local News

Receive daily MCP and OCP news briefings along with email news alerts for $10 a month. Your contribution will help us to continue to provide you with free local news. 

Payment can be made monthly via credit card, bank account, PayPal or Venmo through recurring email invoicing. These payments can be set up for autopay each month.

To sign up, email editor@mediagroup31.com. In the subject line write: Subscription. Please supply your name, email address, mailing address, and phone number (indicate cell phone). We will not share your information with any outside sources. For more than one email address in a household, the cost is $15 per month per email address.

Alternative methods:

  • We can send you an invoice for a yearly payment of $120, which you can conveniently pay online or by check. If you are interested in this method, please email editor@mediagroup31.com and we can sign you up. You can also mail a yearly check for $120 to Media Group 31, PO Box 21, Scottville, MI 49454 (please include your email address).

Payment must be made in advance prior to subscription activation.

We appreciate all our readers regardless of whether they choose to continue to access our service for free or with a monthly financial support.

_____

This story and original photography are copyrighted © 2025, all rights reserved by Media Group 31, LLC, PO Box 21, Scottville, MI 49454. No portion of this story or images may be reproduced in any way, including print or broadcast, without expressed written consent.

As the services of Media Group 31, LLC are news services, the information posted within the sites are archivable for public record and historical posterity. For this reason it is the policy and practice of this company to not delete postings. It is the editor’s discretion to update or edit a story when/if new information becomes available. This may be done by editing the posted story or posting a new “follow-up” story. Media Group 31, LLC or any of its agents have the right to make any changes to this policy. Refer to Use Policy for more information.

Eats & Drinks

Eats & Drinks

Eats & Drinks